![]() |
![]() |
|
![]() |
|
||
|
|
|
|||||
|
|
|
|||||
![]() |
|
|
|
|
|
|
Logroño Production Plant (La Rioja): The plant is located in “Polígono Industrial de Cantabria”, an industrial district in the city of Logroño, and has been in operation since 1985. The site currently employs 250 people and occupies 6,030 m² and is where the Headquarters are based.
Cerquilho Production Plant (Brazil): This plant belongs to CAUCHO METAL PRODUCTOS ENGEBOR do BRASIL, Ltda. and is the result of a join venture between Caucho Metal Productos and Uliana Industria Metalúrgica. The site began operating in 1999 to mainly serve the MERCOSUR market mainly. It is located in the industrial district of Cerquilho, a town situated in the Sao Paulo region. Currently employs 30 people and has a total ground area of 9.131 m² of which only 1.770 are occupied.
Technical Centre (La Rioja): The new Technical Centre, which started operating in autumn 2002, is situated in the industrial district of Cantabria, Logroño, close to the Logroño production plant and Headquarters. It has a ground area of over 700 square meters, 33 employees and modern development and testing equipments of prototypes to serve all production plants of the company in Research, Development, Engineering and Quality.
Abrera Assembly Plant (Barcelona) The site is based in “Polígono Industrial Sant Ermengol”, an industrial district in the town of Abrera, in the Barcelona region, and operating under the name of MONTAJES ABRERA, S.L. This is the newest plant of the company and began operating at the beginning of 2004 with 45 employees for the assembly of sub chassis's.
Commercial Office (Germany) Under the name of CAUCHO METAL PRODUCTOS GERMANY, and situated in the town of Limburgerhof (Rheinland-Pfalz), has begun its activity at the beginning of October 2004 as to give a faster and more effective commercial response to the German and central Europe market.
Sibiu Production Plant (Romania): It is located in the Industrial State of Selimbar, in Sibiu-Brasov. The building was started in 2005 and in August 2006, the production began. It employs 350 people and it has a whole area of 20.000 m2, having 2.600 of them built.
|
|
|||||
![]() |
|
|||||
|
|
|
|||||
|
|
|
|
|
|
|
|